≪ News ≫
About Kochi Expressway traffic resumption (July 13 ...)

2018.07.12

Traffic was restarted from Friday, July 13 Kochi Expressway, Otoyo - Kawanoe east interval.

Section of two-way traffic of one side 1 traffic lane using the down line is approximately 8km.
→The south side of north approximately 3km point - Sasagamine tunnel of Otoyo IC

In addition, Umatate PA of up line seems to be available to be located in the north side of Sasagamine tunnel.

Please see this about detailed information. NEXCO West Japan → http://www.w-nexco.co.jp/